For a level meter with a certain distance beyond the center of the flanges in the storage tank, the most important thing to note is to add a flange or a fixed support in the middle of installation to increase the strength and overcome its own weight, so that the instrument is in a stable state.
Key points for installation of magnetic tiptop level meter:
1. When the magnetic tiptop level meter is installed at the beginning, it should avoid the outlet or inlet far away from the material, so as to stop the drastic change of material fluid in its own local area, which will affect the measurement results of the level meter;
2. When equipped with remote transmission supporting instruments, it is necessary to pay attention to the following:
1) the induction surface of the remote transmission supporting instrument should be oriented and close to the main pipe;
2) the connection between the remote transmission supporting instrument and the display instrument or industrial control machine is preferably laid by a separate protective pipe or a shielded two-core cable;
3) the remote supporting instrument should be attached to the main pipe of the level meter and fixed with stainless steel hoop (forbidden hoop);
4) after the wiring hole of the junction box is laid, it is required to seal well, so as to avoid the invasion of rain water, moisture, etc., so as to prevent the remote transmission supporting instruments from working normally. After the inspection and debugging of the junction box is completed, it should be covered and covered in time.
5) the zero of the remote supporting instrument should be on the same level as the zero indicator of the level gauge
Key points for installation of magnetic tiptop level meter:
1. When the magnetic tiptop level meter is installed at the beginning, it should avoid the outlet or inlet far away from the material, so as to stop the drastic change of material fluid in its own local area, which will affect the measurement results of the level meter;
2. When equipped with remote transmission supporting instruments, it is necessary to pay attention to the following:
1) the induction surface of the remote transmission supporting instrument should be oriented and close to the main pipe;
2) the connection between the remote transmission supporting instrument and the display instrument or industrial control machine is preferably laid by a separate protective pipe or a shielded two-core cable;
3) the remote supporting instrument should be attached to the main pipe of the level meter and fixed with stainless steel hoop (forbidden hoop);
4) after the wiring hole of the junction box is laid, it is required to seal well, so as to avoid the invasion of rain water, moisture, etc., so as to prevent the remote transmission supporting instruments from working normally. After the inspection and debugging of the junction box is completed, it should be covered and covered in time.
5) the zero of the remote supporting instrument should be on the same level as the zero indicator of the level gauge